Design and manufacture of 4 cranes for handling precast concrete elements for the new train tunnel to Jerusalem.
Scope of supply includes:
1) Gantry crane – 42ton, span - 40m (7.5m+25m+7.5m).
2) Gantry crane – 16ton, span – 6m.
3) Double head bridge crane – 20ton, span – 21m
4) Double head bridge crane – 5 ton, span 17m.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|